Interiors – 黑料吃瓜网入口 Thu, 28 May 2026 21:17:31 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.2 Beverly Hilton Public Spaces /projects/beverly-hilton-public-spaces/ Thu, 22 May 2025 20:45:45 +0000 /?post_type=projects&p=3764 黑料吃瓜网入口 is providing upgrades to the iconic Beverly Hilton hotel, including the reception and concierge areas, lobby, dining space, retail space, event lounge and arcade, International Ballroom, Beverly Ballroom, Wilshire Ballroom, restrooms, new stairs and back-of-house rooms, pre-function space, and meeting rooms. All work is taking place while the building remains occupied.

]]>
300 Lakeside /projects/300-lakeside/ Fri, 13 Aug 2021 20:55:51 +0000 /?post_type=projects&p=2151 300 Lakeside, known as the Kaiser Center, is a 28-story, 792,000 SF high-rise commercial office and retail building with three basement levels. The building stands alone but is part of a 7.2-acre city block which includes a five-level, 1,405-stall parking garage with a rooftop garden, and a 128,872 SF, mixed-use office and retail building known as 鈥淭he Mall鈥. 黑料吃瓜网入口’s scope included base building work, landlord鈥檚 work, tenant improvement work, and seismic work. 黑料吃瓜网入口 self-performed lead abatement on all 28 floors, as well as hard and soft demolition, structural concrete, and site work concrete including bollards.

]]>
140 New Montgomery /projects/140-new-montgomery/ Thu, 04 Sep 2014 17:03:56 +0000 /?post_type=projects&p=309 This historic Art Deco structure and former home of the Pacific Telephone & Telegraph Building, designed by Timothy Pflueger and completed in 1925 as one of San Francisco’s first high-rises, underwent significant renovation and conversion into a 280,000 SF modern office tower. Restoration and repair of the signature lobby was complimented with the transformation of the former service courtyard into a sculptural garden and dining area. Original windows were replaced with replica, high efficiency windows and historic wood doors, 鈥淏ell鈥 symbols in the lobby, wood paneling in the executive board room and the marble-clad staircase were restored and retained, as well as a full terra cotta facade restoration. Added amenities included extensive parking and showers for bikes, a restored historic central stair for tenant circulation and a full MEPFS upgrade designed with flexibility, efficiency, and scalability in mind.

 

A full seismic upgrade to the 31-story building included the installation of over 2.5 million pounds of steel reinforcement, 6,400 yards of shotcrete, 10 buckling restrained braces, and five super columns extending continuously from the basement to the 19th floor. Sustainability was a key focus and the building achieved LEED Gold level certification.

]]>
2121 Webster Street / The Pacific /projects/2155-webster-street-the-pacific/ Wed, 16 Dec 2015 00:53:59 +0000 /?post_type=projects&p=1283 Conversion of the former University of the Pacific Dugoni School of Dentistry building into 76 high-end residential condominiums and townhomes. The precast concrete exterior skin was removed and replaced with a high-performance glass curtain wall. Work also included seismic upgrades and all new interior improvements. The townhomes are LEED Silver certified and the nine-story tower is LEED Gold.

]]>
ACT Strand Theater /projects/act-strand-theater/ Thu, 04 Sep 2014 17:14:10 +0000 /?post_type=projects&p=319 黑料吃瓜网入口 transformed a 1917 vaudeville house known as “The Jewel” into a 300-seat venue for the American Conservatory Theater (ACT). In order to adapt the historic, four-story reinforced concrete and steel building into a modern performance venue, many alterations and upgrades were necessary, including a full seismic upgrade to the structure, restoration of the main facade on Market Street, and underpinning and excavation to add square footage. The building鈥檚 complete interior remodel provided a live performance theater, box office, lobby, bar/cafe, green room, office space, and flexible space for rehearsals and gatherings. The project achieved LEED Silver certification.

]]>
Regency Ballroom /projects/regency-ballroom/ Wed, 06 Nov 2024 20:18:15 +0000 /?post_type=projects&p=3610 黑料吃瓜网入口 provided interior renovations of this 115-year-old, multi-use events venue in downtown San Francisco. The scope of work consisted of new dressing room/lounge; all public restrooms; ADA upgrades (new lifts, compliant staircases, and ramps); and HVAC and plumbing for new spaces.

]]>
Meals on Wheels SF /projects/meals-on-wheels-sf/ Thu, 04 Jan 2018 16:44:08 +0000 /?post_type=projects&p=1726 Meals on Wheels is a new, two-story, 36,800 SF facility containing a new commercial high production kitchen, cold storage, warehouse, loading docks, logistics and office space. At the heart of the project is the 22,000 SF high-tech production kitchen for bulk meal production.

]]>
UOP Arthur A. Dugoni School of Dentistry /projects/uop-arthur-a-dugoni-school-of-dentistry/ Wed, 10 Sep 2014 23:51:08 +0000 /?post_type=projects&p=580 Conversion of the former Wells Fargo Data Center in downtown San Francisco into the new Arthur A. Dugoni School of Dentistry. The dental school occupies approximately 225,000 SF of the building and features interactive classrooms, clinical examination floors, and offices. The remainder of the building is being leased to outside tenants.

 

The construction scope involved replacement of the exterior cladding with new high-performance glazing; reconfiguration of the building entry to make it more visible and inviting to pedestrian traffic; installation of escalators between the first and second floors to bring dental patients to the clinical floors; all new MEPFS systems; and state-of-the-art dental equipment for research, teaching, and training. The project achieved LEED Gold certification.

]]>
400/430 California /projects/400-california-street/ Tue, 12 Nov 2019 21:49:45 +0000 /?post_type=projects&p=1852 黑料吃瓜网入口 completed the seismic retrofit of this fully occupied, historic bank originally built in 1908. The project scope included structurally stiffening the bank by adding steel and creating a horizontal wall braced by new concrete and dampeners. That wall was connected to the roof of the bank and stiffened by a lattice frame of new steel. By connecting the neighboring tower to the bank, the deflection of the tower prevents structural failure of the bank.

 

黑料吃瓜网入口 also renovated the 6,500 SF lobby of the building, which included a living green wall from the ground floor to the third floor soffit, updated the building management systems, and the replacement of the building鈥檚 entire glass storefront system. The team self-performed hard and soft demolition.

]]>
Walt Disney Family Museum /projects/walt-disney-family-museum/ Thu, 11 Sep 2014 00:05:56 +0000 /?post_type=projects&p=598 黑料吃瓜网入口 balanced rehabilitation of the historic former barracks on the main parade ground of the Presidio with the need to develop a visitor-friendly layout and infrastructure for multimedia programming around Walt Disney鈥檚 life and work. Construction involved three historic buildings and adhered to federal historic preservation standards. Work included a glass atrium gallery, restoring the original brick facades, and extensively excavating and underpinning to a depth of 35 feet below grade to create an underground theater and sub-basement. The building’s structural systems were upgraded with a variety of seismic connections interwoven with shotcrete.

]]>